Revitalize Military Lodging Building 801

Dobbins Air Reserve Base, Marietta, GA

Construction renovation of 3-story, 32,000 SF military lodging facility including upgrades to meet DoD Antiterrorism Force Protection requirements, as well as structural enhancements and installation of energy efficient blast resistant windows.

Project Description:

Windamir provided renovation of this 3-story 32,000 square foot lodging facility (Building 801) with amenities including wireless internet, fitness room, and a meeting-conference room. This was a comprehensive multi-disciplined renovation and included complete demolition back to structural elements, replacement of HVAC system, new ceilings and lighting throughout, new windows and entrance doors throughout, removed and replaced existing single pane storefront system with a more energy efficient insulated aluminum storefront system, reinstallation of a canopy at the front entrance, upgrade of fire alarm and fire sprinkler systems, new flooring, new interior wall configurations, FF&E, and significant casework. The project also provided upgrades to meet Antiterrorism Force Protection (ATFP) standards including: structural enhancements including installation of carbon fiber reinforcement and expansion of existing structural columns, and the installation of energy efficient insulated blast resistant windows.

Construction Cost: $4.9 Million

Self-performance: Windamir self-performed 62% of the construction work

Project Highlights:
  • Demolition including asbestos and lead-based paint abatement, interior deconstruction and waste management including reuse of Packaged Terminal Air Conditioner (PTAC) and Heat Pump (PTHP) units, Canopy System; and recycling of metals and other debris at Dobbins ARB recycling center
  • Installation of a new elevator including site work, construction of new elevator pit and shaft, and elevator installation
  • Replaced built-up roof with new roof consisting of panel insulation board, hot-mopped fiberglass sheets, hot applied tar, capped with white granulated modified bitum
  • New building systems including HVAC with DDC, electrical including panels, energy efficient lighting, control devices and fire alarm system, data and telecommunications systems, and new sprinklers
  • Updated room layout to include: frame and finish new walls, install Duroplex wall covering, new bathroom cabinetry, new plumbing provisions for each room including water saving fixtures, flooring, doors and hardware, painting, interior signage, & window blinds

Get your next construction project done right, the first time.

We’ll deliver the work on time, on budget, and to your exacting standards.