Windamir provided design-build renovations to Building 9, a 10,000 SF Communications Data Center, including electrical upgrades and providing NIPR/SIPR communications systems. As a mission critical facility building had to remain operational 24/7.

Project Description:

Provided Design/Build Renovation of Building 9, a 10,000 SF Communications Data Processing Center that includes a secure (SCIF) enclosure area. The project began with demolition and asbestos abatement and then proceeded with the renovation of interior finishes including cabinets, flooring, paint, trim, and new acoustical ceiling tile. The existing restrooms were demolished and consolidated into one area. The new restrooms are ADA accessible, with new floor and wall tile, toilet partitions, and fixtures. An existing exterior porch was enclosed to create a true lobby space and the demolished restrooms were converted into an office with a check in window to the new lobby. The new entrance is ADA compliant with a new exterior ramp. Other upgrades included a new HVAC system and new lighting and electrical systems. This project improved the overall electrical systems performance for the building. Replacement of the HVAC system and energy management controls greatly improved the efficiency of the HVAC system. New HVAC work included upgrading the HVAC system for the required added loads of the communications room.

Construction Cost: $1.4 Million

Self-performance: Windamir self-performed 60% of the construction work.

Project Highlights:
  • Demolition including asbestos survey and abatement
  • Site work including site utilities, sidewalks, etc.
  • Secure communications including SIPR (Secure Internet Protocol Router Network) and NIPRnet (Non-secure Internet Protocol Router Network) rooms
  • Replaced electrical including provisioning backup power including Generator/Automatic Transfer Switch/Uninterruptable Power System (UPS) Equipment
  • Install new HVAC with energy management controls and plumbing Install new fire alarm and mass notification systems
  • Install new Viking dry pipe fire sprinkler system
  • New interior wall layout including administrative office spaces, restrooms, break rooms, etc.
  • Interior finishes including sound proofing, new walls, acoustical ceilings, paint, flooring, interior doors and hardware, etc.